In the new season of programmes of capital repair plan to put in order nearly fifteen hundred apartment buildings in Ryazan region. Now the Fund overhaul of preparations for the bidding process to determine contractors. Sum crafted for this purpose 2.5 billion rubles.
the Program overhaul aimed at improving housing conditions, informs GTRK “Oka”, but, as practice shows, a repair can bring a lot of problems. So, last year when replacing roofs on residential buildings of the roof was flooded a few houses in the street Seeds seredy workers repaired the roof in the snow, and the village Builder work was carried out in March rain.
however, but Mayakovsky street during the overhaul dvuhetazhki in apartments burst sewer. In addition, this house was scheduled to complete repairs, and only replaced the roof and the cold water system. In the past year as part of a major overhaul than a hundred homes have “smart” elevators. Nevertheless, the residents are faced with deadlines and breakdowns in the operation.
Victoria Sorokin, Director of organizing and carrying out capital repair Fund capital repair of apartment buildings of the Ryazan region reported that the contractors assessed a penalty for the late. “As for the quality of work we leave to the Commission on these homes sent a claim letter to contractors has removed defects”.
Region can not boast of positive results for major repairs. Currently solved the issue about creating a healthy competition in the auction must participate more contractors.
Text: GTRK “Oka”